Mailing Address: RR#1
Donalda, AB
T0B 1H0
Office: 403.883.2671

Email:
info@tundraenvirodrilling.ca
 
NEW SERVICES 2009
In response to the current global market and economic conditions, is committed to support our clients so you can continue to be successful in this competitive market.

Steps to reduce operational costs without sacrificing safety or requirements:
Eliminate the cost of two different rigs for the same project. ’s new rig is capable of switching from solid stem augers to air rotary drilling on site in minutes.

These boxes will eliminate the travel cost for supply units for projects with up to 8 water monitoring materials with an average depth of 6 meters.